Saturday, July 7, 2018

New Saros Projects



Hull and Deck 

  • New lifelines. (2005)
  • New mast compression post and related deck rebuild.(2006)

























  • New stainless-steel folding stern boarding ladder. (2006)
  • Re-core, finish port-side foredeck. (2006)
  • Re-bed keel-hull joint. (2011)
  • Fabricate and finish new companionway hatch boards. (2011)
  • Refinish tiller. (2011)
  • Prep and re-paint entire stern. This was required by the motor mount replacement. (2011)
  • Prep and paint outboard rudder to match main boat. (2011)
  • Before rebuild. Note damage at hinge point.
  • Port-side locker seat rebuild. Remove skin, grind out core, fabricate new tapered marine plywood core, epoxy in, fiberglass over. (2011)
  • Install stainless hawsepipe.(2013)


Mechanical

  • New 4HP Tohatsu 4-stroke outboard. (2011)
  • Remove, re-glass, re-drill, and replace stern motor mount. (2011)
Old Motor mount and motor. 

New Motor mount and motor.
  • New through-hulls (2011)

Electrical/Electronics


  • Complete electrical re-wire.(2011)
  • New runnning lights.(2011)
  • New Speed and Depth instruments and senders.(2011)
  • New interior LED lights. (2011)
  • Solar panel and charging system.(2011)

  • New DC breaker panel. (2011)

  • New conduit and wires in mast. (2011)
  • LED masthead anchor light.(2011)
  • Solar-powered deck-mounted ventilation fan.(2011)


  • Install Raymarine Tillerpilot 1000+ (2018)

Sails and Rig

  • Install cabin-top backed padeyes; convert traveller to double-mainsheet system. (2005)



  • New Cruising Direct (used) mainsail. (2007)
  • Add 2 additional internal halyard exit plates. Now we have 2 main and 2 jib halyards.
  • All-new running rigging. (2011)
  • Add anti-bird spikes to masthead.
  • Rivet small bails at spreaders to facilitate anti-bird monofilament. (2011)
  • Remove, polish, rebed masthead and mast foot SS fittings.
  • Install Selden extendable bowsprit (2018)





Ground Tackle

  • New 22-lb Bruce anchor w/ 20' chain + 100' anchor line. (2011)
  • Simple roller added to stemhead (2013)
  • 6 new mooring cleats. 2 4-foot cleats at bow. 2 4-foot cleats at aft quarters. 2 2-foot midship cleats at widest point (2018).

Accomodations

  • New Porto-Potty (2005)
  • Repair/refinish interior step. (2006)
  • Strip/refinish floorboards in main cabin. (2011)
  • Fabricate 9 marine plywood berth-top boards w/ pull holes. (Previous cushions had heavy integral boards.) (2011)
  • Reduce thickness of all cushions. Re-cover. (2011 - in progress)
  • Move Porto-potty a few inches back for proper positioning. (2013)

Miscellaneous

  • Repair new wooden dinghy hole where some jerk threw a rock at it (2018)





Back on the dinghy mooring.