Hull and Deck
- New lifelines. (2005)
- New mast compression post and related deck rebuild.(2006)
- New stainless-steel folding stern boarding ladder. (2006)
- Re-core, finish port-side foredeck. (2006)
- Re-bed keel-hull joint. (2011)
- Fabricate and finish new companionway hatch boards. (2011)
- Refinish tiller. (2011)
- Prep and re-paint entire stern. This was required by the motor mount replacement. (2011)
- Prep and paint outboard rudder to match main boat. (2011)
- Port-side locker seat rebuild. Remove skin, grind out core, fabricate new tapered marine plywood core, epoxy in, fiberglass over. (2011)
- Install stainless hawsepipe.(2013)
Before rebuild. Note damage at hinge point. |
Mechanical
- New 4HP Tohatsu 4-stroke outboard. (2011)
- Remove, re-glass, re-drill, and replace stern motor mount. (2011)
Old Motor mount and motor. |
New Motor mount and motor. |
- New through-hulls (2011)
Electrical/Electronics
- Complete electrical re-wire.(2011)
- New runnning lights.(2011)
- New Speed and Depth instruments and senders.(2011)
- New interior LED lights. (2011)
- Solar panel and charging system.(2011)
- New DC breaker panel. (2011)
- New conduit and wires in mast. (2011)
- LED masthead anchor light.(2011)
- Solar-powered deck-mounted ventilation fan.(2011)
- Install Raymarine Tillerpilot 1000+ (2018)
Sails and Rig
- Install cabin-top backed padeyes; convert traveller to double-mainsheet system. (2005)
- New Cruising Direct (used) mainsail. (2007)
-
Add 2 additional internal halyard exit plates. Now we have 2 main and 2 jib halyards.
- All-new running rigging. (2011)
- Add anti-bird spikes to masthead.
- Rivet small bails at spreaders to facilitate anti-bird monofilament. (2011)
- Remove, polish, rebed masthead and mast foot SS fittings.
- Install Selden extendable bowsprit (2018)
- New Cruising Direct (used) mainsail. (2007)
- Add 2 additional internal halyard exit plates. Now we have 2 main and 2 jib halyards.
- All-new running rigging. (2011)
- Add anti-bird spikes to masthead.
- Rivet small bails at spreaders to facilitate anti-bird monofilament. (2011)
- Remove, polish, rebed masthead and mast foot SS fittings.
- Install Selden extendable bowsprit (2018)
Ground Tackle
- New 22-lb Bruce anchor w/ 20' chain + 100' anchor line. (2011)
- Simple roller added to stemhead (2013)
- 6 new mooring cleats. 2 4-foot cleats at bow. 2 4-foot cleats at aft quarters. 2 2-foot midship cleats at widest point (2018).
Accomodations
- New Porto-Potty (2005)
- Repair/refinish interior step. (2006)
- Strip/refinish floorboards in main cabin. (2011)
- Fabricate 9 marine plywood berth-top boards w/ pull holes. (Previous cushions had heavy integral boards.) (2011)
- Reduce thickness of all cushions. Re-cover. (2011 - in progress)
- Move Porto-potty a few inches back for proper positioning. (2013)
Miscellaneous
- Repair new wooden dinghy hole where some jerk threw a rock at it (2018)
Back on the dinghy mooring. |